"Using programming tools special software was developed by engineers for communication with offshore and onshore terminal PDS for data collecting, anaylze, reporting and exchange."
"It was developed new distributed control system from the scratch including project engineering, installation of field instruments, wiring, commissioning and handover to operations."
"The consumption was measured by means of meters installed on several gas lines, and the data received in the RTU was processed there and transmitted to the head office via a GSM modem."